.26 July 2008
Still a ton of work to do, but final inspections are Monday. Maybe hope to move in over the next couple of weeks?
Images are:
1. House exterior taken from the southwest
2. Kitchen overview-- cabinets installed, but no doors or drawer fronts yet
3. Looking at the stairway from the kitchen (downstairs)
4. Downstairs bath with Julie's never-ending tile job
5. Upstairs bath cabinetry, sink, & floor tile
6. Upstairs bath tub & shower
7. Master bedroom with newly-installed carpet & Penn
8. Upstairs hallway running on south side of house
9. Upstairs hallway looking north with stair guard rail
10. Stair guard rail