We're starting to make progress again after the birth of the boy, but negative 38 temperatures haven't helped much. Reclaimed timbers to frame exposed rafter tails and lookouts next. Hope to get roof dried in before the next big storm comes.
Some pictures of the guy who has been slowing our house progress a little (including a picture of Matt with a special treat from the boy): Penn Jasper Sleightholm, born December 29, 2007; and then some current construction photos: starting on second story walls.